cubic meters per day open cut mining equipment schedule

3. CALCULATION OF MACHINE RATES

3.1 Introduction. The unit cost of logging or road construction is essentially derived by dividing cost by production. In its simplest case, if you rented a tractor with operator for $60 per hour including all fuel and other costs and you excavated 100 cubic meters per hour, your unit cost for excavation would be $0.60 per cubic meter.

Explore further

Dozers Graders Scrapers Loaders Excavators Craneslearncivilengineering/.../imagDig Into Excavator Productivity For Construction ProsforconstructionprosProduction Rate Tablewisconsindot.govEstimating Excavation Revised Craftsman Book Companycraftsman-bookRecommended to you based on what's popular • Feedback

MINING EQUIPMENT NAMES List of mining equipment: types

Jun 30, 2019 It can excavate 240,000 tons of coal or 240,000 cubic meters of wastewater per day, the equivalent of a 30-meter-deep soccer field. The coal produced in a day

Production Rate Table

LF/DAY 22,000 85,000, 60,000 typ. 1. The expected production ranges in the table is the remaining range of production rates after 25% of the highest values and 25% of the lowest values have been removed. The typical production rate is the median. Production Rate Table.

File Size: 136KB

MINING & EARTHMOVING Hawthorne Cat

a total of 1000 loose cubic meters (1308 yards) have been moved? Swell is 25%. Bank = Loose ÷ (1 + Swell) = 1000 LCM ÷ (1 + 0.25) = 800 BCM 1308 LCY ÷ (1 + 0.25) = 1046 BCY Load Factor — Assume one bank cubic yard of material weighs 3000 lb. Because of material char-acteristics, this bank cubic yard swells 30% to 1.3 loose cubic yards when

File Size: 1MB

Rate Analysis of Excavation in Earthwork -Calculate

Dec 18, 2014 Lets say for 10m3, the hydraulic excavator is taking 0.04125 day. Then its capacity considered is ((1×10)/0.04125) = 242.4242 m 3 / day. That means, a hydraulic excavator can excavate 242.4242 m 3 of soil in one day. Its cost per day including driver and fuel is Rs. 5000. Then the cost of 10m 3 of excavation can be calculated as:

Future of Canadian Oil Sands Engineering and Project

cubic meters) from the mineable area, totaling 75.9 million cubic meters (4 77 million barrels), for a total of 1.31 million barrels (2 07.4 thousand cubic meters) per day. While the bitumen produced from mining was upgraded, bitumen crude produced from in situ operations was mainly marketed as

Mining Cost Service Costmine

Mining Cost Service is the industry standard reference for Mining Cost Estimation. This system places cost estimating data at your fingertips with conveniently indexed information to make your cost estimates faster, easier, and more credible. Monthly updates assure that

Earth moving Equipment function and standard Productivity

Feb 16, 2013 Earth moving Equipment are used in the construction projects, in order to prepare a plan and time schedule for such activities you should be aware of different types of Earth moving Equipment and the productivity for each Equipment (how much cubic meter of soil can be moved or excavated in a certain amount of time or how fast material can be transported).

Estimating Excavation Revised

13 Earthmoving Equipment: Productivity Rates and Owning & Operating Costs up to the estimator to convert those quantities into loose and compacted cubic yards for the cut and fill quantities, respectively. I’ve also found that engineers make mistakes in you’ll get paid at that price per cubic yard

Inventory Mining Equipment

ASEA 4 rope Koepe hoist. 84" diameter, 13/16" diameter ropes, line speed 2000 FPM, shaft depth 2700 ft., designed out of balance 7.5 tons, maximum load 82,000 lbs., disc brakes, powered by ASEA LA605 direct coupled overbearing motor, 600 HP, 91 RPM, 440 Volt DC motor, MG Set ASEA 700 HP, 1200 RPM synchronous motor, complete with electric control with A10 programmer and ASEA winder

Estimates of Electricity Requirements for the Recovery of

Open-File Report 2011–1253. U.S. Department of the Interior . U.S. Geological Survey . underground cut-and-fill mining at 1,500 metric tons per day using the carbon-in-pulp leach cubic foot (ft3) 0.02832 cubic meter (m3) Mass pound, avoirdupois (lb) 0.4536 kilogram (kg)

EARTHWORKS ESTIMATING THE FUNDAMENTALS

part to the Caterpillar Handbook. Open-cut miners will always refer to soil quantities as ‘bcms’, but we like to think of it as ‘undisturbed’ cubic metres. CCM: This describes soil after it has it is compacted. Once again the degree of compaction needs to be established, and this is achieved with the help of densities, and density ratios.

How to Estimate the Cost of Mechanical Dredging

months per year, current fuel price per gallon, and economic and local factors. The example shown in this paper does not include a detailed calculation of monthly equipment costs. Overview of Labor . Labor consists of personnel necessary for the operation of the dredge, and attendant plant and equipment.

High Grade Open Pit Mining Scenario, La India Project

Mar 04, 2020 A ‘skin' of waste around the vein was added to the mineralized zone along with a minimum mining width in order to reflect the mining selectivity of the expected mining equipment (typically small 2 to 3 cubic meter backhoes) loading 25 to 30 tonne haul trucks employed by the local contract mining companies. This equipment routinely achieves 40

Rule 403 Fugitive Dust Control California

10 to exceed 100 micrograms per cubic meter when determined as the difference between upwind and downwind samples collected on federal reference method samplers at the property line for a minimum of five hours, except during High Winds. Installation of samplers or monitors to

Operating Cost for Miners SRK Consulting

Open Pit Mine Design, Planning, and Engineering Aside from assessing and evaluating social-environmental concerns and designing the mining and material movement approach, the first question often asked is, "how much will it cost us to mine?" This may need to be determined even before you decide that there is a potential project.

(PDF) Surface Mine Design ResearchGate

During the life of open pit mining, a haul road must be maintained into the pit. A spiral A spiral system is an arrangement in which the haul road is arranged spirally along the

Excavation calculator: cost and volume JustCalc

excavation costs Be aware! When excavating, the price per 1 m³ of the soil can increase with the depth of the trench. The price is usually double if deeper 1 m. You should take it into account and specify an average price per 1 m³ (you have to enter the price of 1 m³ to excavate and price of 1 m³ to transport); volume of basement

It all comes back to $ per metre

A scraper may cost $1.20 per metre on its minimum cycle distance, but you can triple the haul length from 130 to 400 metres for almost no difference per cubic metre of load. Excavators are extremely flexible machines, able to "bench" their way in to jobs a scraper could

How Do Courts Measure Damages Related to Project Disruption?

Oct 16, 2017 Some examples of construction labor productivity are: pounds of duct work per hours; labor hours per electrical circuit installation; cubic meters per crew per day; cubic yards of cut and fill per hour; cubic yards of excavation per shift; labor hours per linear foot of pipe installed; labor hours per square foot to set and strip formwork

How Much Does Excavation Cost?

Also, many hiring companies will apply: float charges (e.g. daily fees if the excavator cannot be parked securely or legally on-site, which may range from $225 to $750),; travel fees (time and expenses to deliver the machinery to your address and collect it back),; penalty rates (e.g. for excessive wear and tear of particular excavator parts) and/or; other surcharges (e.g. extra $30-$50/hr if

Novosibirsk Oblast Wikipedia

Prospected mineral water reserves in the region amount to 6,948 cubic meters per day. The popular Karachinskaya mineral water originates from the region. The oblast has 4,531,800 hectares of forests, with 509.88 million cubic meters of timber reserves. Most of the region's forests consist of softwood.

Dharmendra Pradhan: India to see Rs 10,000 crore

Nov 19, 2020 Pradhan said 20-25 million standard cubic meters per day-equivalent LNG will be consumed in the transportation sector. "LPG is going to be priced cheaper. If

Groundwater impact of open cut coal mine and an assessment

Sep 01, 2017 Open cut coal mining in New South Wales has resulted in mine pit depths of 150 m or more below the natural water table, and the backfilling and reshaping of more than 10 billion cubic meters of spoils waste rock. Groundwater can represent a problem during surface mining and its removal can prove costly.

Surface mining planning and design of open pit mining

Jan 09, 2016 Table 1 is the calculation of the mining cutoff grade for a copper project with the following parameters: 30 kt/d (33000 st pd) of ore mined for 20years $300,000,000 capital cost (include replacement capital) $1.00 mining cost per ton of ore $0.95 mining cost per ton of waste $3.00 processing cost per ton of ore $1.00 general and administrative

Operating Cost for Miners SRK Consulting

Open Pit Mine Design, Planning, and Engineering Aside from assessing and evaluating social-environmental concerns and designing the mining and material movement approach, the first question often asked is, "how much will it cost us to mine?" This may need to be determined even before you decide that there is a potential project.

(PDF) Surface Mine Design ResearchGate

During the life of open pit mining, a haul road must be maintained into the pit. A spiral A spiral system is an arrangement in which the haul road is arranged spirally along the

Groundwater impact of open cut coal mine and an assessment

Sep 01, 2017 Open cut coal mining in New South Wales has resulted in mine pit depths of 150 m or more below the natural water table, and the backfilling and reshaping of more than 10 billion cubic meters of spoils waste rock. Groundwater can represent a problem during surface mining and its removal can prove costly.

ITY CIL PROJECT

4.5 Mining Equipment Selection and Pricing 4.3 4.6 Available Time Assumption 4.4 4.7 Mine Equipment Productivity Assumptions 4.4 4.7.1 Hydraulic Excavator Ore Loading 4.4 4.7.2 Off Highway Truck Productivity 4.5 4.8 Mining Equipment Operating Quantities 4.6 4.9 Owner Cost Modelling 4.7 4.9.1 Personnel and Manning 4.7

Athabasca oil sands Wikipedia

As of 2010, oil sands production had increased to over 1.6 million barrels per day (250,000 m 3 /d), where 53% of this was produced by surface mining and 47% by in-situ. The Alberta government believes this level of production could reach 3.5 Mbbl/d (560,000 m 3 /d) by 2020 and possibly 5

Cost to Excavate Land 2021 Cost Calculator (Customizable)

The cost to Excavate Land starts at $75.48 $177 per cubic yard, but can vary significantly with site conditions and options. Get fair costs for your SPECIFIC project requirements. See typical tasks and time to excavate land, along with per unit costs and material requirements. See professionally prepared estimates for land excavation work.

fldgi ( ^ PART Y%S ,xld m%cd;dka;%sl iudcjd§ ckrcfha .eiÜ

49. Concrete batching plants having a production capacity of 50 or more cubic meters per day. 50. Glass or glass based product manufacturing industries. 51. Lime kilns having a production capacity of 20 or more metric tons per day. 52. Ceramic industries where more

How Much Does Excavation Cost?

Also, many hiring companies will apply: float charges (e.g. daily fees if the excavator cannot be parked securely or legally on-site, which may range from $225 to $750),; travel fees (time and expenses to deliver the machinery to your address and collect it back),; penalty rates (e.g. for excessive wear and tear of particular excavator parts) and/or; other surcharges (e.g. extra $30-$50/hr if

Novosibirsk Oblast Wikipedia

Prospected mineral water reserves in the region amount to 6,948 cubic meters per day. The popular Karachinskaya mineral water originates from the region. The oblast has 4,531,800 hectares of forests, with 509.88 million cubic meters of timber reserves. Most of the region's forests consist of softwood.

Rule 403 Fugitive Dust Control California

10 to exceed 100 micrograms per cubic meter when determined as the difference between upwind and downwind samples collected on federal reference method samplers at the property line for a minimum of five hours, except during High Winds. Installation of samplers or monitors to

Modeling for the Steady State Production of Large Open

production exceeds to 10,000 tons per day is considered to be the large opencast mines. For the open-cut mining or open cast mining is a method of extracting rock or minerals mining cost + reclamation cost per ton of minerals) / (cost per cubic meter of over burden by the

3 Technologies in Exploration, Mining, and Processing

Surface mining today is characterized by very large equipment (e.g., trucks that can haul more than 300 tons of rock, loading shovels with buckets greater than 36 cubic meters, draglines with buckets greater than 120 cubic meters), and modern technology for planning, designing, monitoring, and

4. ESTIMATING ROAD CONSTRUCTION UNIT COSTS

For example, a 6.0 meter subgrade on a 30 percent slope with a 1.5:1 fill slope and 0.5:1 cut slope with a one foot ditch and a 20 percent shrinkage factor would be approximately 2100 bank cubic meters per km for a balanced section.